Super-crystal hardness wallpaper primer of wall decoration
Delivery term:The date of payment from buyers deliver within days-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Beijing
-
Validity to:
Long-term effective
-
Last update:
2017-12-14 17:55
-
Browse the number:
35
+
Wingene Electronic Development Co Ltd
- Contactaixin:
Contactaixin:
txjlf(Ms.)
- telephone:
-
Area:
Beijing
Address:Block E Tongsheng Industry Zone, ShanghenglangDalang Street, Longhua New District, Shenzhen, Guangdong, China (518000)
- Website:
+
Model Number: Garefu06
Brand Name: Garefu or OEM
Key Specifications/Special Features:
Information:It's anewtypeofenvironmentalfriendlywalltreatmentmaterial co-invented by Garefu and ETA Solutions Ltd in Britain which has Shore hardness of HA40.Use itbeforepastingwallpaper, it can effectively formingaprotectivelayer up to 60um onthewalltopreventthewall surface from falling apart andwaterleakage, dry quickly, alkalinity-resistance, strengthen grass-roots nature of the anti-cracking.Itcan improvethebondingstrengthbetweenwallpaperandwall, alsoplaying a role ofmouldprooftowallpaper.It's the newest update of original crystal primer.Characteristics1.Excellent adhesion and water resistance.2. Crystal hardness of HA40, anti-microbial abuse.
3. Mouldproof to wallpaper.
4. Anti-alkali performance.
5. Applying to many types of wall surface.
6. Dry quickly, shorten the construction time.
Product usage
1.Thisproductcanbeconstructedbybrushing, rollercoating, orspraycoating.
2. Pleaseadd0.3L~1Lwateraccordingtotheactualsituationofwall, thenstirevenly.Itcanbeusedafterfullydiluted.
Theconstructionareais 15–25m2.
3. Dryingtime:accordingtotheactualconstructiontemperature, rangefrom30minutesto24hours.
3. Mouldproof to wallpaper.
4. Anti-alkali performance.
5. Applying to many types of wall surface.
6. Dry quickly, shorten the construction time.
Product usage
1.Thisproductcanbeconstructedbybrushing, rollercoating, orspraycoating.
2. Pleaseadd0.3L~1Lwateraccordingtotheactualsituationofwall, thenstirevenly.Itcanbeusedafterfullydiluted.
Theconstructionareais 15–25m2.
3. Dryingtime:accordingtotheactualconstructiontemperature, rangefrom30minutesto24hours.
Shipping Information:
- FOB Port: Any Port as Client's Requirement
- Lead Time: 5 - 8 days
- Dimensions per Unit: 9.5 × 9.5 × 22.5 Centimeters
- Weight per Unit: 1 Kilograms
- Units per Export Carton: 24
- Export Carton Dimensions L/W/H: 57.5 × 38.5 × 24 Centimeters
- Export Carton Weight: 27.3 Kilograms
Main Export Markets:
- Asia
- Central/South America
- Eastern Europe
- Mid East/Africa
- North America
- Western Europe