Stainless Steel M8+M10 Standard Combi Nut Steel Pipe Clamp

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-17 11:04

  • Browse the number:

    51

Send an inquiries
+
Anping County XINHAI Traffic Wire Mesh Manufacture CO., LTD.
Contactaixin:

Contactaixin:

wlfastener(Mr.)  

telephone:

Area:

Beijing

Address:

The East of Industrial Zone,, Hengshui, Hebei, China (053600)

Website:

http://wlfastener.xianjuncheng.com/

+
Model Number: TJLD-J4 Brand Name: TJLD Key Specifications/Special Features: Title:Stainless steel M8 + M10 standard combi nut steel pipe clampAdvantages:Materials: steel, SS steel aluminum Pipe clamp galvanization with rubber with screwSanitary wareclamp (rubberpipe clamp)Dual threaded M8-M10 nut2-piece M6 screws with Phillip hex head design2-piece black color plastic washer
Only in CRCA sheet clamp
EPDM rubber
Load test certificate also available
Packing in polybags and then in cartons small sizes upto1 1/2"
20-piece in single poly bags and 4''
10-piece in single poly bags
Packing of 400 hundred pieces in single carton or minimum 20kg
If as per customers requirement then cost will be 2 more
Stamping as per customers requirements
No extra cost (Both in mm and inches sizes with vendors logo)
Iron black powder coated spring washer also available for producing tension while clamping for M6 screws
Iron washer cost extra which
Specifications:

Pipe clamp
Materials: steel/carton steel, SS, ALU
Thickness: 1.5/2.00mm
Width: 20mm
2-piece (M) 6x20mm screw
Size mm For Width (mm) Thickness(mm)
1/2" 22 20-25 20 2
3/4" 28 26-30 20 2
1" 35 32-36 20 2
1-1/4" 40 38-43 20 2
1-1/2" 48 47-51 20 2
2" 60 58-64 20 2
2-1/2" 75 75-80 20 2
3" 90 87-92 20 2
3-1/2" 100 98-105 20 2
4" 115 113-118 20 2.5
5" 140 138-142 20 2.5
6" 160 159-166 20 2.5
8" 200 195-202 20 2.5
Shipping Information:
  • FOB Port: Tianjin
  • Lead Time: 15 - 25 days
Main Export Markets:
  • Asia
  • Australasia
  • Central/South America
  • Eastern Europe
  • Mid East/Africa
  • North America
  • Western Europe